An application to renew the approval to withdraw up to 22.3 million gallons per month (mgm) of groundwater from existing wells 1, 2, 3, 4 and 5 for public water supply and renew the approval of a surface water withdrawal of up to 37.2 mgm from the Fourth Hollow Reservoir on Broad Run for industrial use at the Panther Creek Energy Facility. The project wells are completed in the Mauch Chunk Formation. The wells and surface water source are located in the Nesquehoning Creek watershed in Nesquehoning Borough, Carbon County, Pennsylvania, within the drainage area to the Lower Delaware, which the Commission has classified as Special Protection Waters.
Contact Information
*Indicates Required Fields
Thank you for subscribing to the 2024-Q4-08 Nesquehoning Borough Authority D-1994-047 CP-3 mailing list.
An application to renew the approval to withdraw up to 22.3 million gallons per month (mgm) of groundwater from existing wells 1, 2, 3, 4 and 5 for public water supply and renew the approval of a surface water withdrawal of up to 37.2 mgm from the Fourth Hollow Reservoir on Broad Run for industrial use at the Panther Creek Energy Facility. The project wells are completed in the Mauch Chunk Formation. The wells and surface water source are located in the Nesquehoning Creek watershed in Nesquehoning Borough, Carbon County, Pennsylvania, within the drainage area to the Lower Delaware, which the Commission has classified as Special Protection Waters.
Contact Information
*Indicates Required Fields