Hazleton City Authority, D-1991-065 CP-4. An application to approve an increase in water withdrawal allocation from 2.5 mgd to 5.0 mgd from the existing Lehigh River intake and renew the approval of water withdrawal allocations of 3.60 million gallons per day (mgd) of water from Quakake Creek and Biesels Run combined (collectively referred to as the Hudsondale Sources), 4.75 mgd from the Dreck Creek Reservoir and 3.72 million gallons per month (mgm) from Buck Mountain Well No. 1 for public water supply. The water withdrawn will continue to be exported out of the Delaware River Basin (DRB) to a wastewater treatment plant located in the Susquehanna River Basin (SRB). The exportation of up to a maximum of 10.97 mgd (340.07 mgm) of water approved by this docket is a sum of the previously approved individual source allocations and is not an increase in the previously approved exportation amount. The increase in the Lehigh River source allocation is needed to meet increasing population growth and new industrial and commercial development. The docket combines several former DRBC approvals into one consolidated withdrawal docket. The docket holder’s sources are located in Lehigh, Lausanne and Packer Townships, Carbon County and Hazle Township, Luzerne County, Pennsylvania in the Lehigh River watershed within the drainage area to the Lower Delaware, which is classified as Special Protection Waters.