Public Comment Form

Womelsdorf-Robesonia Joint Authority, D-1998-023 CP-3.

Please use this form to submit comments to the DRBC on the draft docket for Womelsdorf-Robesonia Joint Authority, D-1998-023 CP-3.  An application to renew the approval of an existing groundwater withdrawal with a decrease in allocation from 23.0 mgm to 17.0 mgm to supply the applicant's public water supply distribution system from existing Wells Nos. 1, 2, 8 and 9.  Project Wells Nos. 1 and 9 are completed in Cambrian-age Leithsville and Richland formations, repectively.  Wells Nos. 2 and 8 are completed in Precambrian-age felsic to mafic gneiss. The project is located in the Tulpehocken Watershed in Millcreek Township, Lebanon County Pennsylvania and the Spring Creek Watershed in Heidelberg Township, Berks County, Pennsylvania.




Contact Information

All fields are optional unless otherwise indicated.

Submitted by:

First Name (required)

Last Name (required)

Address (required)

City/Town (required)

State/Province

ZIP (required)

Email (required)

Your Comment

Please use the box below to make a comment on the selected item. After you have entered your comments, please select "Continue" to review your comments.


View Draft Item

*Uploading a file is optional*
You may attach up to five 30 MB files to accompany your submission. Allowed formats are pdf, jpg, jpeg, png, txt, gif, doc, docx.


Thank you for subscribing to the Womelsdorf-Robesonia Joint Authority, D-1998-023 CP-3. mailing list.